509-766-2914
Mon-Thu: 7-4, Fri: 7-3 (Nov-Mar), Sat/Sun: Closed
13058 N Frontage Rd E, Moses Lake, WA 98837
M1-Tanks
M-1 Tanks Facility

Why Choose M1-Tanks

Search Drawings

Built to Last

Superior Quality

  • Washington State approved products
  • Rebar reinforced concrete construction
  • 5000 psi minimum compressive strength
  • Designed for 3' burial depth plus 2500 lb. wheel load

Precision & Consistency

  • Controlled manufacturing conditions
  • ASTM C-1644 compliant rubber boot seals
  • Stainless steel clamps for pipe connections
Quality concrete products
Delivery and placement services

Delivery & Placement

Site Preparation

  • Dig hole 36" longer and wider than tank dimensions
  • Ensure flat surface, clear of large rocks
  • Trench corners for proper weight distribution

Delivery Process

  • Direct delivery to job site
  • Professional placement assistance
  • 12-foot rear axle clearance required

Important Notes:

  • • Holes must be ready before delivery
  • • Each tank requires separate positioning
  • • For sandy soils, soak pathway 24 hours prior
  • • Ground should be firm enough for pickup truck in 2-wheel drive

Custom Solutions

Mold Modifications

  • Rubber boot casting (2-18 inches)
  • Custom pipe hole placement
  • Direct drive rubber boots
  • V channeling for irrigation canals

Additional Services

  • Core drilling
  • Concrete cutting
  • Patching services
  • Chemical crystallization additive

Timeline & Process:

  • • Custom projects completed in 3-5 weeks
  • • Timeline includes concrete curing time
  • • Inventory can be modified to match specific needs
Custom solutions and modifications

Ready to Start Your Project?

Get in touch with our team for expert guidance on your precast concrete needs. We're here to help bring your vision to life.